中文
華星東方承建的江西省龍南市(三南)生活垃圾焚燒發(fā)電項(xiàng)目煙氣凈化工程開(kāi)工建設(shè)
2022.12.23
我公司承建的江西省龍南市(三南)生活垃圾焚燒發(fā)電項(xiàng)目煙氣凈化工程于2022年11月10日開(kāi)工建設(shè)。
The FGC project undertaken by Huaxing for Longnan (Sannan) Waste-to-Energy plant in Jiangxi Province  was commenced on November 10, 2022.
該項(xiàng)目總規(guī)模為日處理生活垃圾1000噸/天,協(xié)同處理餐廚垃圾以及建筑垃圾等設(shè)施。一期工程項(xiàng)目規(guī)模為日均處理生活垃圾500t/d,配置1x12MV汽輪發(fā)電機(jī)組,全年可處理入廠生活垃圾量18.25萬(wàn)噸。煙氣處理采用“爐內(nèi)SNCR+半干法(旋轉(zhuǎn)噴霧)+干法(干粉噴射)+活性炭吸附+袋式除塵+飛灰輸送、儲(chǔ)存及穩(wěn)定化工藝”的煙氣凈化工藝,為我司EPC工程。
The total scale of the project is 1000 tons / day of municipal solid waste, collaboratively treating kitchen waste, construction waste and other waste. The scale of the 1st phase is 500t/d of municipal waste, equipped with 1x12 MV steam turbine generator, and the annual treatment capacity can be 182,500 tons. The FGC process applied "in-furnace SNCR + semi-dry rotary spray + dry method with dry powder injection + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization process". It is an EPC project of Huaxing.
華星東方在江西省的業(yè)績(jī)涵蓋包括:九江都昌、南昌洪城、宜春、南昌泉嶺、宜春豐城、贛州南康、龍南等多個(gè)項(xiàng)目。
Huaxing's achievements in Jiangxi Province include Jiujiang Duchang, Nanchang Hongcheng, Yichun , Nanchang Quanling, Yichun Fengcheng, Ganzhou Nankang , Longnan, etc.

更多內(nèi)容請(qǐng)點(diǎn)擊或掃描下方!
關(guān)注我們!
For more information, please click or scan below!

Follow us!