The flue gas cleaning project of the Fenyang waste incineration power generation project in Luliang City, Shanxi Province, undertaken by Huaxing East Co., passed the 72+24 hours trial operation
2024.01.18
The flue gas cleaning project of the Fenyang waste incineration power generation project in Luliang City, Shanxi Province, undertaken by our company, passed the 72+24 hour trial operation on November 28, 2023.
This project designs and builds a 1×750t/d waste incinerator production line equipped with 2×6MW turbine generator sets. The flue gas cleaning adopts the flue gas treatment combination process of "semi-dry method (rotary atomization semi-dry reaction tower) + dry method (slaked lime injection) + activated carbon injection + bag dust collector", which is our company's equipment supply project.
Huaxing East Co's performance in Shanxi Province covers multiple projects in Yangquan, Taiyuan, Luliang Fenyang, Jinzhong, Yuncheng, Yuncheng Xiaxian, Xinzhou, and Datong.
Copyright ? 2021 Jiangsu Huaxing Dongfang Electric Power Environmental Protection Technology Co., Ltd. All Rights Reserved. 備案號(hào):蘇ICP備16018214號(hào)